Thursday, August 21, 2008

Deck In Progress

With our deck needing painting desperately, basement flooding and rain water draining issues and Chris wanting an "under the deck" access plan, we decided in early summer that replacing the deck would be our summer project of choice. I must be honest up front that Chris has done 99% of the work, most of it during the hot, sweaty evenings! All but the framework has been replaced, including the deck boards, railings and balisters!
Here, Chris worked on the back 1/3 of the deck while the kids were up for a visit in mid-July. Keeping them off the deck was near impossible, but no one got hurt so that's a plus!!

We also had the concrete slab on the side of the house replaced this week, as you can see above that the previous slab had falled away and left in it's place a huge hole. Rainwater was seeping in through this hole into the window-well and down into the basement! Chris had a pump in the window-well for most of the summer as a temporary fix, but the new slab as well as an under-the-deck drainage pipe will hopefully eliminate the need for the pump!!

Chris ordered these awesome tiki torches which match the deck perfectly and give off much more light at night than we imagined possible.
A side view of our new concrete slab! Now that this is poured, Chris can finish the last 1/3 of the deck closest to the house. We can also start working on a rock border and flower bed that we plan to put in underneath the silver maple tree (right side of pic)! I know Chris is anxious to have this deck project finished! He had done such a good job, but I know that the project is getting OLD!!!

2 comments:

Anonymous said...

Hey Kathryn! Your deck looks AWESOME! I love the ballisters. I did not know that you had a blog too. What a fun way to keep in touch when we only see eachother at "shift change." Life can sometimes be way too busy!

Katie said...

WOW! It looks fabulous! Great job Chris! Sorry to hear about the basement flooding.